Sunday, June 19, 2011

The day is finally here!

The Wildlife In Need Center is moving to its new home!
After several years of searching, rasing funds and support, and negotiating leases, our more efficient, more green, more public-friendly facility will be opening on Monday, June 27th.

To accomodate for the moving process, the Center will not be accepting calls for phone counseling, nor will we be accepting patients to our clinic on:
Thursday, June 23rd
Friday, June 24th
Saturday, June 25th 
Sunday, June 26th

Click here for links to other area resources that can be of assistance if you've found an animal that you think needs help.
We will open the doors at our new facility at W349 S1480 S. Waterville Road Suite B on
Monday, June 27th.
Please note that our new phone number will be (262) 965-3090

Saturday, May 28, 2011

The Final Push has Begun!

Well, we are in the final push to get the new facility completed and the activity level has reached a fevered pitch. One of the most important features of the new building is the use and conservation of water. Through the help of Joel Reinders, we have installed a system that will allow us to collect nearly all of the rain water from the roof of the new building. This water will then be used to help clean the outdoor enclosures reducing our dependency on the well water. 

Near the front entrance to the building a small water feature will serve as an example of the types of water conservation methods similar to our facility-sized system in the back that can be implemented by the average homeowner.
Additionally, our parking lot, walkways and patio are all constructed out of permeable paving bricks. This system created with these bricks, rather than traditional asphalt, allows water to pass through the paving and is then absorbed directly back into the ground. This eliminates the need to create large retention ponds. It also allows us to create various natural habitats for wildlife of all sorts.

These special pavers will help to reduce the amount of contaminated runoff collecting outside the parking area. Special care must be taken to keep them in good shape year after year, but the environmental impact is worth the effort.
Considering the surrounding environment was very important for us when we planned and designed this building. In addition to the water conservation efforts outside, the building is efficient in a variety of other areas, from the special heating and cooling system to the rain collection program. When the center opens to the public later this summer, people will be able to see how we have incorporated these various efficiencies into the design. They also will be able to see how they too can benefit from these programs in their own homes.

Natural materials and efficient heating, cooling, and electrical systems were used as much as possible as you can see here in the nearly completed front office area.
We look forward to seeing you all at our new facility in the very near future! Watch for updates in the coming weeks when we announce our long-awaited final move-in date!

Friday, May 13, 2011


This week and the following, one of the biggest projects going on at the site is the preparation and laying of the permeable paver parking lot. This system allows the water to filter through the parking area more naturally and return back to the water table rather than collecting the dirt and debris and becoming run-off like it would on a traditional black-topped surface.

The exterior of the building is nearly completed.
We hope to be able to make an official move date annoucement in the next few weeks!

Wednesday, April 27, 2011

April Showers Shall Bring May Flowers

As the spring finally arrives, the new WINC facility is really taking shape. When we set out to design the new center, we wanted to be a green as possible - not always an easy thing to do with a “medical” building. One of the more visible features of our green building however is that we are collecting 100% of the rainwater from the roof and recycling it for use in our outdoor enclosures. This water will be used to clean and water the enclosures throughout the summer. Additionally, a demonstration area has been built to showcase how ordinary people can employ the same techniques at home. Through visual aids and regular public programs we plan to illustrate how anyone can reuse water for irrigation and other outdoor needs. We will also demonstrate how by creating a natural way of filtration, you can create a wonderful outdoor habitat for wildlife that will continue throughout the year. Water conservation and water issues are important for all of us especially in southeastern Wisconsin. Our hope is that this educational model can help someday reduce dependence on well and city water throughout Waukesha County

As we move forward as an organization the intent at the new WINC facility will not only be to rehab our injured and orphaned wildlife, but to educate people in the community about ways they can help our surroundings – in turn helping wildlife themselves. 


 Just behind the building, between the library/meeting room and the outdoor enclosure area is the main focal point of the rear water retention system. This area will have a small fountain (much like the smaller size system in the front) that will help to keep the water filtered on a continual basis.


These blocks create the structure that holds the retained water. They have been buried underground and are strong enough to support the weight of the ground, rocks and living habitat that will be created atop them.


WINC volunteer and supporter, Joel Reinders, helps to lay out the foundation rock for the surface of the water retention system. This system will not only allow us to keep many thousands of gallons of water from going directly back into the area streams and groundwater, but will allow us to filter and reuse it as well - saving many gallons of water that would need to be used to properly clean and maintain our outdoor enclosures. This above ground fountain area will also serve as an ideal living habitat for native wildlife and a peaceful sight for staff, volunteers and visitors to the center.


This entire system and the beautiful landscaping that will cover it couldn't have been possible without the combined support of Reinders Inc, Dean Pipito Water Features, the Waukesha County Extension and our many dedicated supporters and volunteers. If you would like to make a monetary or in-kind donation to help us complete this project please contact us.

Wednesday, March 16, 2011

Spring is in the air

The central hallway is now mostly framed in; soon walls will be up and it will start to become a real building!

As we advanced our clocks ahead this past weekend, I know that spring is just around the corner. The only problem is that it sure doesn't feel or look much like spring right now. From the pictures I’ve added you can see some progress, but the real progress is in what you can’t see. First off, all the plumbing is in place and the electrical work will begin this week. The heating and cooling is going in as evidenced by all the duct work throughout the building as well. We now have a completed roof, and even the garage and flight enclosure are being finished up. Soon we will be knocking down the wall between the existing building and the new facility. This portion was waited on so that we could ensure the least amount of heat-loss possible. The good news; we are still targeting a mid May completion date. This will mean that we are planning our move for the first part of June. As long as the weather holds, and barring any unforeseen set-backs we should be able to stay on schedule. The next big step; walls!!!!

The front office will have space for all of our office staff as well as a reception and volunteer area.

The flight area is getting its roof! The area will be flexible allowing us the ability to split it into smaller areas for less flighted or smaller birds or open up all the areas for one long flight corridor.

The other good news is that we are nearing completion of our capital campaign goal! If you can help we would love to count you as part of our "flock." Visit our website or contact the Center for more information.

Friday, February 18, 2011

The roofing has been going up all week now that the weather has broken

Our builders are working hard to get the outside of the building completed so that work can progress on the inside
Thank you to our long-time volunteer, Bill, who generously brought in these photos to help us all keep up with the progress!

Thursday, February 10, 2011

It was too early to say...

Winter has caught up with our new facility, slowing things down a bit :(

 In my last blog I think I jinxed us a little bit. I had said we were on schedule as January settled in and, of course, that’s when we got socked with all sorts of winter weather. For those of us who actually like winter and snow, it was nice to see, but for building purposes it is not a welcome sight. With the weather stabling again, we continue to make progress, but we have lost some time. Hopefully we can make up for this once we get closer to moving day.  

Looking into the new office area of the facility, the front door is just to your left
Now, to update you on where we’re at. The building is really taking shape; nearly all of the interior walls are framed. You can actually walk through the facility now and imagine what each room will look and feel like when complete. The workflow too, can be imagined; how things will operate and where things will go. Of course it never takes long to fill space and once we start admitting patients, taking on new volunteers, interns and researchers and inviting the public out for on-site programming, the days when it seemed so big will be long gone. Either way you look at it, the reality is that we will have a much nicer, roomier, more efficient workspace then we could have imaged ten years ago.   

The future looks bright!
On another note, our capital campaign continues to push on. We are well over three quarters of our way to our goal of $1.3 million. The support has been incredible and we are all so appreciative of everyone who has contributed. If you are interested in contributing to this great project, feel free to contact the center at 262-968-5075, or visit our website at http://www.helpingwildlife.org / http://www.helpingwildlife.org/aboutus/futurewinc.htm

Wednesday, January 19, 2011

Space is a relative thing

We have almost all of our walls in place!
 I was talking with someone about the size of the new facility when all we saw was the concrete slab. It looked not nearly as large as I thought it should. We discussed that, throughout the building process, there will be times that the space looks smaller then expected and then other times when it will appear much larger. 

The next time I commented on the size was when they were building the walls and the space looked enormous. A few weeks ago when the roof had begun to be installed it looked small again. Today, I went out to take some updated photos. I stood in what will become the gathering area that is now framed and thought to myself what a wonderful space for a group of students to meet and learn. I walked the halls of the new clinic area (virtual halls since the interior walls are not all up yet) and thought, “How are we ever going to fill all this space.” In the end, I am not worried about filling the space, as we all know you never have enough space because you can always find something to fill it with. 


In the Gathering and Kichenette areas - view of the Gertrude Sherman Building through the framing
 It seems with the snow on the ground and temps projected to fall into the single digits, that we may never see the completed project. But I’m assured that just in time for the spring melt we will have a wonderful new facility to call home. It really is taking shape and watching the progress and being a part of the growth is really something special. I’m happy to be able to share it with you.

M.G.

Saturday, January 8, 2011

A New Year Begins


View from the west- you can just see the footings for the garage that will be built on this side of the building in the coming spring. It will serve as a utility storage area as well as a tool shop for various projects.
 As the January cold sets in we are making good progress on the building.  We are on schedule and things are beginning to look quite impressive.  As you can see by the latest pictures, the walls are being completed and the roof is almost fully installed.  Once we can “button up” the building we can start to work on the interior and then our future will really begin to take shape.  Everyone involved in the project has been working hard on making this dream a reality and I am grateful for it.  
View from the east- the Gertrude Sherman building (on right) will see some changes too when the buildings are joined together later this winter.

The capital campaign continues to be successful, and we are now starting work on a long-term relationship with UW-Waukesha and the UW System.  The program planning for the new facility has begun and the level of enthusiasm and excitement just continues to grow.  With the collaboration between UWW and WINC taking shape, the full impact of what we have been able to create using the new facility as our catalyst is very exciting. 


Capital Campaign Donor, John Peterson and Executive Director, Michael Guzniczak stand in the area which will become the new Board Meeting Room.
Thank you all for your well wishes and continuing support, we wouldn't be here if it weren't for you. M.G.

Wednesday, December 29, 2010

On December 20th the Staff, Board, supporters and builders from the Wildlife In Need Center and UW-Waukesha gathered for what is known as a "Topping Out" Ceremony. This signifies a milestone because it is when the topmost portions of the buildings framing is put into place.
Although the weather outside... isn't balmy, everyone was willing to tolerate it long enough for the celebration!

Even some of the canine invites helped us send good wishes into the rafters of our new facility!

Alterra Coffee and Hot Chocolate from Black Canyon Coffee, paired with some delicious cookies made it even better!

Wayne Grandy, the Vice President of the WINC Board and also the Committe Chair for the Capital Campaign Committee as well as John Rodell, the Board President for WINC, have had a big hand in making this project a reality. Thank You!

Wednesday, December 22, 2010

Another milestone...

... was reached when the WINC staff and Board, members of the University of Wisconsin-Waukesha and key people in the construction and funding of the new facility came together on Monday, December 20th for a “Topping Out” ceremony.  The event is a tradition in the building trade to signify the milestone of placing the highest point of the building.  For us, that is the rafter-peak and everyone got the chance to leave their signature, along with their hopes and dreams for the new building.  

Although the temperature was a little cold, the hot chocolate, coffee and cookies afterward helped warm all who attended.  With the rafters going up this week, we are only a week behind our scheduled timeline.  Not bad considering the delays we had in starting and the weather we’ve had so far this season.

The builders have assured us that they will continue to work throughout the winter and we will be in our new home by the start of WINC’s 2011 busy season. 

Until the next update, on behalf all of us at the Wildlife in Need Center want to wish you and you family a happy holiday season, Merry Christmas and a Happy New Year.  As one of our board members said, it is looking like a really great New Year for WINC!

Wednesday, December 8, 2010

Excitement and Progress


Framing has begun!

Well the weather held off just long enough for us to stay on track and schedule. The cement slab was poured and the framing has begun as of the end of November. With the building at this stage work should be able to continue throughout the winter, which is a huge relief to all of us involved.

It also means that we can start to turn our attention to the physical move scheduled for April of 2011. There is no question that this will take a lot of planning, cleaning, organizing and logistics. The off-season this year is probably going to be our busiest ever. This, of course, will put a strain on the staff, but the light at the end of the tunnel is getter brighter and we are all excited about the end result.

Also during this time, we will start working with UW-Waukesha to fine tune, and implement some of the collaborative strategies we’ve talked about over the last year and a half. For so long we’ve been focused on a new facility. But, turning our attention to the collaboration and the opportunities the new facility now presents raises the level of excitement to new heights all around. While the facility represents a new benchmark in the growth of the Wildlife in Need Center, the collaboration represents a new chapter in the Center’s long-term vision.  It’s exciting times at the center and I hope all of you are as thrilled with our growth and progress as we are.  


Smooth-textured and tinted cement will make up the floors in much of the clinic areas.


The view of the structure from the NE (back of the building with the Gertrude Sherman Building to the east)
Guest Blogger M.G.

Saturday, December 4, 2010

December Snows...

... Bring progress and excitement! We are all greatful to the builders and our supporters, and most of all to Mother Nature, for getting us to the point we needed to be at before winter came upon us! Work continued through November getting the frost walls poured, the well dug, the plumbing installed and the flooring cement poured as well!



As these snowflakes fall they are drifting upon the framing which began going up this week. Watch next week as we get you caught up this aspect of the building process!

Have a warm and safe day!

Wednesday, December 1, 2010

Things We Are Thankful for...


Proper Site Preparation...

Digging Holes!

Safety First, Proper Signage...

And Footings!
This collection of photos were all shot as work progressed throughout October and into November. Watch in the coming weeks as we keep you posted as the new WINC facility gets framed and becomes a real building!

Saturday, November 20, 2010

Although ground was broken in May, major construction began at the site in September. Below you will see some photos of the site just before construction began which will be really fun to look at once there is a building where there was once a field!


The west side of the Gertrude Sherman Building

Looking East toward the west side of the Gertrude Sherman Building
The area where the new WINC facility is being born!
 Keep watching as we keep you up to date on progress!

Tuesday, November 16, 2010

After two and a half years...

...the Wildlife in Need Center (WINC) has begun construction of it's new home in Ottawa!

Through a collaboration with the University of Wisconsin-Waukesha (UW-W), WINC will relocate it's operation to a new, nearly 6000 sq.ft. facility. The new facility is being built at the Field Station managed by UW-W and will become an addition to an existing structure, the Gertrude Sherman building. The Gertrude Sherman building was built in 2000 and houses a classroom and pottery studio. While the current building will remain and the use of the building will stay the same, both the new addition as well as the existing building will provide for expanded learning opportunities for both UW-W students as well as for WINC.  

Construction officially started in October of 2010 and we anticipate a completion date sometime in May 2011 - just in time for our busiest season. WINC currently treats approx. 2100-2500 animals a year.  In the new location, WINC will be able to provide care for a small number of additional patients as well as provide a much more efficient facility for our volunteers helping us care for them. In addition, the facility will allow WINC to expand it's educational programming allowing for on-site education programing, something the center has been unable to do at it's current location. 

Although WINC and UW-W will remain seperate entities, through this collaboration we will be able to enhance many aspects of each other's missions. The recently added research component of our mission will also see added benefits. Proposed research projects will consist primarily of diet research, rehabilitation impact studies on various species and other field research projects both on and off-site. The intern program at the center will also be expanded to include year round learning opportunities in animal care, community outreach, education and research.

Not only will the new center provide an enhanced experience for the wildlife patients and volunteers of the organization, it will also be a showcase for various green building applications, from an advanced storm water recyling program featuring a complete water reclamation system to advanced energy saving design features. In addition, the center will feature a number of unique habitat restoration projects in conjunction with UW-W.

Michael Guzniczak, Executive Director of WINC says "This represents one of the most significant milestones in the organization's 16 year history. [By moving to the UW-Waukesha Field Station] Not only are we able to construct the new state of the art, energy efficient facility, which has been in our plans for nearly 6 years, but we also have a wonderful opportunity to collaborate with UW-W and the rest of the UW System. That collaboration will yield significant success in both our mission and programing as well as the mission of UW-W. [Speaking for WINC] the entire organization could't be more excited."

We hope you're excited to and stay tuned to watch our progress!

Trees being thinned out, relocated and removed at the UW-W Field Station site

Site Clearing began as early as this past summer while actual construction began just last month
















Guest Blogger M.G.

Friday, November 12, 2010

Breaking Ground






The Gertrude Sherman building at the University of Wisconsin - Waukesha Field Station. The new home of the Wildlife In Need Center will be added on the this existing structure which provides 2 classroom spaces used by UW-Waukesha


Members of the Board, long-time supporters, and Capital Campaign Committee Members, Wayne Grandy, Mary and Tom Roberts help celebrate the first shovel-full



Shovel's In! Work on the long-waited for NEW Wildlife In Need Center facility has begun! We hope you'll join us as we Move Ground and Soar to new Heights